Case Study
Project Design and Management Services
Case Study: Project Design and Management Services Location: Tiffany Platform Removal of Corroless and Barite Powder from 3 x Silos onboard the Tiffany Platform Sureclean Scope Provide manpower and equipment for the removal of 90 Tonnes of Bulk waste from 1 x Silo by means of vacuum transfer onboard the Tiffany Platform to allow fabrication works to commence. Technical Challenge Sureclean were to devise a method for the complete removal of all wastes from Silos onboard the Tiffany Platform with zero man entry. Tank Specifications: The Silos are positioned on the East Side of the Tiffany Platform. There are 3 in total however only North 1 and South Silo contain waste cement to be removed. Each silo has total capacity of approx. 40m3. Total Contents North 1 – 28.5m3 South 3 – 19m3 Total of a