BP Thunderhorse Subsea PLET Reconnect Project Location: Offshore, 150 miles south of New Orleans in the Gulf of Mexico Operator: BP During the rehabilitation of the Thunderhorse field, problems were discovered with some of the welds in the subsea manifolds and PLET’s, resulting in them having to be brought to the surface for inspection and remedial repairs. Sureclean Scope Provide manpower and equipment for the removal of existing field joint coating using Ultra High Pressure Water Jetting Cold Cutting application to facilitate NDT inspection and repairs. The Technical Challenge Engineering a solution which safely, effectively and efficiently removed the coating (4 inch layer of composite material (polypropylene), without damaging the flow line and importantly contained all water and debri