Case Study
Prise d'eau de Sainte-Foy
In 2007, construction of a new water intake to be submerged in the St. Lawrence River was built to increase production of drinking water for the City of Quebec and reduce the risk of water shortage. The intake was designed with a stainless steel piping system carrying brine anti-freeze liquid to prevent freezing during Winter months. To join this system, a reliable pipe joining solution was required that could provide quick and easy acces