Case Study

Principal Place

Principal Place

CASE STUDY PRINCIPAL PLACE Falco Construction Ltd was appointed by Byrne Bros to install a sewer connection from the Principal Place basement to the sewer in Worship St. The heading had to pass through a box out in the internal wall of the basement which was formed by BB. Behind the wall was a piled wall consisting of 750mm diameter reinforced concrete piles. The piled wall was removed by a specialist concrete cutting contracted using rotary core