Case Study
Apsley Manor Estate
CASE STUDY APSLEY MANOR ESTATE Sector: Power Client: Thames Water Duration: 16 weeks Location: Hertfordshire As an approved Lot 5 framework contractor for Thames Water we were appointed as Principal Con- tractor to carry out a Foul Water Sewer Requisition Scheme in Hertfordshire. Part of the scope required us to plan, apply for and manage road closures and Streetworks Permits with Hertfordshire Highways. The works involved construc- tion of two 8