— TEIAS CASE STUDY Preparing Turkey’s electricity transmission and generation system for future energy demand with ABB AbilityTM Capacity Expansion and ABB AbilityTM PROMOD2 CASE STUDY TEI A S — The challenges With Turkey’s electricity demand growing by almost five percent annually, the Turkish government began an initiative to diversify its energy production through an increase in renewable sources and use of other indigenous sources. In addition to its environmental benefits, this initiative also provides Turkey with the opportunity for more energy independence by reducing imported fossil fuels. With renewables currently making up 48 percent of Turkey’s total installed capacity of 88,894 MW, along with additional planned investments into renewable energy technologies,