Case Study

Series Compensation for fast and cost-effective increase of transmission capacity in power grid

Series Compensation for fast and cost-effective increase of transmission capacity in power grid

Pages 2 Pages

Series Compensation for fast and cost-effective increase of transmission capacity in power grid In a contract with ENELVEN, a regional electrical utility in Ven- ezuela, ABB has installed a total of five series capacitors in their power grid to increase the capacity of existing overhead transmission lines serving the petroleum and petrochemicals center of Maracaibo. The total installation of reactive power in the contract amounts to close to

Join for free to read