Power producer minimizes planned outage duration with reheater isolation solution

Power producer minimizes planned outage duration with reheater isolation solution

Pages 2 Pages

POWER Power producer minimizes planned outage duration with reheater isolation solution RESULTS • Reduced planned outage duration from 5 days to 1 day unlocking an additional $346K in revenue • Eliminated risk of damage to adjoining pipework during reheater isolation and resulting leakage • Eliminated high recurring maintenance costs • Improved safety of maintenance and operations personnel APPLICATION Isolation of the hot and cold reheat lines during maintenance of the reheater unit. CUSTOMER A major coal fired power plant (2x 350MW) in The Philippines. CHALLENGE Isolation of the reheater unit in a power plant is a critical action in any scheduled outage plan. It facilitates safe maintenance and inspection of the unit, chemical cleaning, tube leak repair, and hydro-testing before t