Case Study
Power Plant Reduces Risk of Outage and Minimizes Safety Risks with SIL2 Suitable Guided Wave Radar
© 2010 Rosemount Inc. All rights reserved For more information: www.rosemount.com POWER Power Plant Reduces Risk of Outage and Minimizes Safety Risks with SIL2 Suitable Guided Wave Radar ROSEMOUNT 5300 Figure 1.Three Rosemount 5301 Guided Wave Radars used for condenser level control. RESULTS • Reduced risk of higher operations & maintenance costs • Decreased safety risks • Minimized risk of outages APPLICATION Steam/Water levels in condenser and water pre-heaters for supercritical circulating fluid bed (CFB) boilers CUSTOMER PKE Elektrownia Lagisza (PKE Lagisza Power Plant) in Bedzin, PL CHALLENGE During construction of the world’s largest supercritical fluid boiler at PKE, engineers needed to design superior safety shutdown systems, stability, and reliability into the steam generat