Case Study

Power Plant (Malaysia)

Power Plant (Malaysia)

Pages 4 Pages

Inspection Results Power Plant (Malaysia) CondensersJob Overview Rutledge conducted an AcousticEye non-invasive inspection on two condensers at a power plant in Malaysia consisting of a total of 45,650 titanium tubes. This is the first time that the plant inspected 100% of the tubes. Conventional technologies were utilized for their previous inspections (sampling). The customer was most interested in identifying internal corrosion (mainly p

Join for free to read