Case Study

Cleaning & Inspection - Coal powered Power Plant (Malaysia)

Cleaning & Inspection - Coal powered Power Plant (Malaysia)

Cleaning & Inspection Coal powered Power Plant (Malaysia) ? Heater UnitsJob Overview Adamasia, a SWIS exclusive partner, recently completed an inspection of four heater units at a coal fired power plant in Malaysia. The four units consisted of 9,114 U-tubes. ? Customer awarded Adamasia a contract to open, clean and inspect four heater units at the power plant. ? The client chose Adamasia for the work due to their prior experience with APR, the capabilities of the Sonic V device, and the ability of this technology to easily detect flaws in U-tubes.Cleaning method Cleaning Heater units in coal fired power plants is particularly challenging because the tubes have a U-bend and contain thick residue that is difficult to get to. Since APR inspections require clean tubes for accurate an

Join for free to read