Power Plant Boiler Cleanup System Saves Time

Power Plant Boiler Cleanup System Saves Time

Pages 1 Pages

Power Plant Boiler Cleanup System Saves Time PUMPS • TANKS • FILTRATION • PIPE • SPILLGUARDS 800 742 7246 rainforrent.com BACKGROUND A South Carolina power plant needed to carry out planned maintenance for the plant’s boiler. The chemical flush of the boiler was on a fixed timeline and 18 coated tanks were required onsite for fluid containment within 30 days. OUTCOME Rain for Rent sourced and staged all the coated tanks required to store the post-flush fluid after the cleaning process. The tanks stored the fluid for 60 days prior to disposal. Each tank was manifolded and outfitted for spill containment. HIGHLIGHTS • Job-Walks: Rain for Rent Operations and Safety teams held job walks to ensure a precise footprint design for the tight space. Only 28’ of real estate was available to s