Pumping Solution at Hydropower Facility Saves Customer Time and Money
Pumping Solution at Hydropower Facility Saves Customer Time and Money PUMPS • TANKS • FILTRATION • PIPE • SPILLGUARDS 800 742 7246 rainforrent.com BACKGROUND Every 10 years the LADWP (Los Angeles Department of Water and Power) performs routine maintenance on a hydropower facility bay. The most recent maintenance project required a temporary system that would dewater the bay within 48 hours so that other maintenance tasks could be carried out within a very tight schedule. No delays would be allowed due to the limited time incoming lake-water could be diverted into a neighboring lake; any deviation from the schedule could result in major issues, including flooding. OUTCOME Rain for Rent designed and delivered a multi-phase dewatering system that was installed by the facility’s Unio