Case Study
Port of Oakland Inner Harbor Turning Basin - Oakland, California
Port of Oakland Inner Harbor Turning Basin Oakland, California Year of Completion: 2006 Construction Cost: $15M Client: Dutra Construction Services Performed: Design • Geotechnical analysis and design, numerical modeling, structural design, Seismic design, value engineering Construction Services • Construction Staging, Construction support and super vision, pile load test evaluation Combination wall prior to bulkhead cap installation.