Case Study
Port of Oakland Berth 35/37 - Wharf Embankment Strengthening Oakland, California
Port of Oakland Berth 35/37 - Wharf Embankment Strengthening Oakland, California Year of Completion: 2007 Construction Cost: $24M Client: Port of Oakland Services Performed: • Existing Structur e Condition Survey and Assessment • Incr ease Berth Depth tp -50ft • 2,000ft berth r epair • Bollar d and Fender Systems Impr ovements • Crane Gir der and Piling Str engthening • Wharf Embankment Bulkhead Design • Operational