Case Study
Polyurethane Concrete Leveling
Experienced Geotechnical Contractors helitechccd.com 1-800-246-9721 EARTH SHORING GROUND IMPROVEMENT DEEP FOUNDATIONS VIBRATORY STONE COLUMNS MICROPILES GROUTING PROJECT CASE STUDY Sector: Manufacturing Warehouse Description The owner of this building had added industrial storage racks inside the building to increase the floor storage capacity. At the time, the owner did not realize the slab and subgrade were not designed to take on the additional weight. Over time, the subgrade consolidated and the floor slab sank, resulting in uneven concrete throughout the warehouse. Requirements & Challenges The manufacturing area ran 24/7 and Helitech CCD needed to work around their equipment and schedule. The work are was a “clean” area which meant excessive dust or spoils we