Case Study

Point Foundations Warehouse

Point Foundations Warehouse

CASE STUDY Point Foundations Warehouse Sonderborg, Denmark For the construction of a warehouse and DIY shop in Sonderborg a big amount of point foundations was needed to support the concrete pillars. Fibre Reinforced Concrete was offered as a solution to reduce the construction time. Challenge For the construction of the warehouse and DIY shop a total of 48 pillars were needed. The estimated time to install the point foundations with steelcages made out of 12mm rebar was 25 days. The point foundations are 1,7x1,7x0,7m and will provide the structure’s stability from the ground. It will distribute the weight of the structure over a larger area as to avoid over- loading of the soil beneath. Solution • After consultation with the Client and Installation Contractor, PP