Temporary Warehouse on Unlevel Ground

Temporary Warehouse on Unlevel Ground

A leading global manufacturer of forklift trucks and other materials handling equipment needed a temporary warehouse to accommodate products that had previously been stored outside or in the existing warehouse. This would then free up the space in the warehouse. The only suitable space they had available though for the temporary warehouse was on unlevel ground, with a variance of 1.5m from the lowest to the highest point - HTS INDUSTRIAL were the only supplier to provide a full and detailed technical spec on the foundations and concrete ring beam required to accommodate the slope and the building. To achieve a level and safe base there was no room for any error in the sizing and laying of the concrete ring beam. Working closely with the groundworks crew HTS ensured this was achieved.