Case Study

Point Defiance Regional Treatment Retrofit

Point Defiance Regional Treatment Retrofit

Biofiltration Owner: Metro Parks Tacoma Engineer: Parametrix Contractor: Ceccanti Inc. Technical Description: l CDS ® Hydrodynamic Separator l Filterra ® Bioscape l StormGate™ High Flow Bypass Structure Installation: December 2015 Polluted stormwater is one of the largest threats to the health of Puget Sound, so the city of Tacoma joined forces with Metro Parks Tacoma to host an innovative water treatment s

Join for free to read