Case Study
Plymouth Promenade
The Solution Each bay was visually checked for defects and then hammer testing. Once all defects were identified they were broken out and all loose debris was removed. Once broken out the steel was then treated with a Steel Primer. All defective areas were then shuttered and repaired. Once cured an Anti Carbonation coating was applied to the repaired area, blending in with the current promenade colour. Materials: Flexcrete 841 Steel Primer, Flexcrete Monolite, Flexcrete Bond-Prime, Flexcrete Monodex Smooth, Flexcrete Curing WB and Flexcrete Monomix Plymouth Promenade Concrete Repairs © South West Concrete Repairs Ltd | Registered in England & Wales No. 3431115 Unit 17, Reynolds Park E sales@swconcreterepairs.co.uk 8 Bell Close W www.swconcreterepairs.co.uk Newnham