Case Study

PLAYING OUR PART IN DELIVERING A MORE CONNECTED SOUTH PACIFIC

PLAYING OUR PART IN DELIVERING A MORE CONNECTED SOUTH PACIFIC

Pages 1 Pages

DXN LIMITED | Case Study PLAYING OUR PART IN DELIVERING A MORE CONNECTED SOUTH PACIFIC MANUFACTURED TRANSPORTED AND INSTALLED IN 6 MONTHS Industry: Communications Solutions Specifications: • Build to withstand seismic zone 4 and Category 5 cyclones • 4 Racks total 8kW IT load • 2N fully redundant DC power system with 4hrs battery backup • N+1 cooling redundancy • VESDA and Argon gas fire suppression • Full access control & CCTV security Overview DXN was contracted by the Government of Niue to design, engineer, build and deliver a prefabricated cable landing station which will be the point of termination for the first submarine cable that will be landing in the pacific island of Niue.

Join for free to read