Case Study

Plant Optimisation

Plant Optimisation

Key Insight: It was an absolute pleasure to work with a dedicated improvement team who understand their business priorities and goals. Together, we were able to implement solutions that were effective and sustainable. The benefits achieved by the project were calculated by the client’s team. Our Goal: For three months, Key Engineering and our costumer’s process team performed analysis and modifications to the existing control system logic in an effort to further improve plant’s stability and throughput. Projects Completed: • Revise the use of the current constraints. • Middling PID tuning/Middling SoftStart. • Product Fines PID control loop. • Oversize PID control loop setup. • Ore Break on shuttle • Tertiary crusher optimisation. Our Solution: Key Engineering was in