Case Study

Petaluma Bridge Construction Project

Petaluma Bridge Construction Project

Pages 1 Pages

Petaluma Bridge Construction Project September, 2013 Volume 325 Your Water, Wastewater, & Materials Dewatering Partner 5031 68th Street SE, Caledonia, MI 49316 | (616) 575-8693 | Fax: (616) 575-9031 Objective During construction of a new bridge footing in the Petaluma Riv- er, a slurry seal was poured into a caisson and did not properly set. The contractor was required to dredge out the slurry seal prior to attempting another pour and s

Join for free to read