Case Study

Pembroke Power Station

Pembroke Power Station

Pages 2 Pages

The challenge In order to meet the highest standards, Pembroke Power Station must demonstrate that it has effective measures in place to reduce any risk and comply with Pollution Prevention Control (PPC) regulations. CASE STUDY DECEMBER 2012 FACT FILE Location Pembroke, Wales Year 2009 Constractor Interserve Industrial Services Owner RWE npower Segment/building use Power station pipe insulation The challenge for Interserve Industrial Servi

Join for free to read