Pembina County Drain

Pembina County Drain

Pages 4 Pages

Solution Project KLJ completed , , and for the project before the spring of 2013; however, the area experienced yet another flooding event that required KLJ to adjust and fortify the . The substantial elevation changes and erosion in the area added complexity to the project. The resulting design included a 10” diameter corrugated , , a . The design focused on isolating the location where there was a sudden change in elevation and slowed the speed of the water in the channel. This helped prevent future damage to the pipe and also minimizes erosion from occurring along the drain. Our team also completed the USACE for the project. KLJ coordinated with county officials from the beginning of design to the end of construction. Phase one of construction was completed in November 2013 so County