Case Study

Pedestrian Swing Bridge Support Piles

Pedestrian Swing Bridge Support Piles

Pages 2 Pages

Pedestrian Swing Bridge Support Piles Contract No: C787 Client: Barhale Construction Location: Northwich, Cheshire Value: Approximately £223,300.00 Summary: Removal of existing collapsed pedestrian swing bridge and supply and installation of steel tubular piles to support a new pedestrian swing bridge across the river Weaver. Sheet Piling (UK) Ltd were employed by Barhale Construction Ltd to carry out the piling works for construction of a new pe

Join for free to read