Case Study
Paint Detackification –Solids Removal Project
Wastewater Treatment Case Study Paint Detackification – Solids Removal Project 2 Background A major paint manufacturer was facing increased pressure from the local POTW to improve the effluent quality of their wastewater discharge with regards to TSS, color and BOD standpoint. This particular customer re-uses its totes and are washed at the facility. This rinse water was being filtered and discharged to the local POTW. In addition, t