Situation ? Facing increased production demand an automotive assembly plant had limited sludge removal equipment that could not handle the increased loading ? Sludge bags had to be changed many times per shift which often overflowed causing safety issues as well as increased manpower to clean it up – costs were high Background ? OEM was operating at a production rate of 600 units per day and wanted to increase to 900 per day ? The sy