Case Study

Orthopaedic Hospital

Orthopaedic Hospital

JDRM Mechanical design of HVAC systems involved supply air to the resident rooms and support areas by multiple packaged variable air volume rooftop units. Supply air to the operating room area is provided by a constant volume outdoor air handling unit with refrigerant cooling coils and desiccant dehumidification wheel. The unit operates continuously and the outside airflow quantity is monitored by an air flow measuring device. Orthopaedic Hospital This 69,000 square foot Orthopaedic Hospital consists of 36 resident rooms; 6 operating rooms; associated pre-op and post-op areas; MRI and CT scan rooms; as well as physical therapy, kitchen, and dining areas. The building’s systems were designed to reduce energy consumption as much as possible while complying with electrical and mechanic