Case Study
Orange Park Wastewater Plant Orange Park, FL
Because Efficiency Counts Call us Toll Free: 888.325.5033 Project Profile PP-OP-8-2013 Project Profile Summary at a Glance Project Installed: March 2008 Plant Size: 2.5 MGD Service Objectives: • Reduce Influent Nitrogen • Reduce Influent Pollutant Load • Reduce Sludge Production • Control Fats, Oils, and Grease (FOG) Performance Summary: • 52% Reduction Influent CBOD • 29% Reduction Influent TSS • 36% Reduction Efflue