Case Study
Ft. Dodge Wastewater Treatment Plant
Because Efficiency Counts Call us Toll Free: 888.325.5033 Project Profile PP-FD-2011 Summary at a Glance Project Installed: March 2011 Plant Size: 4.00 MGD Service Objectives: • Reduce Lagoon Sludge • Fats, Oils, and Grease (FOG) Reduction Performance Summary In just the 3 months from Installation: • 26% Sludge Reduction (Lagoon 1) • 16% Sludge Reduction (Lagoon 4) Financial Payback: $200,000 Ft. Dodge Wastewater Tre