OMEGAX™ Saves Operator 15 Hours Of Rig Time And $28,000

OMEGAX™ Saves Operator 15 Hours Of Rig Time And $28,000

Pages 1 Pages

Updated August 2019. Copyright © Gyrodata, Inc 2019 Operators in West Texas are constantly looking to improve their efficiency. Traditionally, a post drilling survey in the lateral would require a pumping truck, a wireline truck, and a designated 12 (+/-) hours of dedicated rig time to run an electric line gyro. By utilizing a drop survey landing in the BHA and the rig's circulating time as the pump down regime, Gyrodata was able to save time and reduce the risk of stuck pipe. ? Gyrodata utilized the drop survey method, saving the rig approximately* 15 hours. This survey method was previously not possible in a lateral hole section. However, using the solid-state SPEAR technology inclination restraints are no longer a factor. ? The operation utilized the time the rig was circula