Case Study

Omega completes 8 well P&A campaign on Norwegian Continental Shelf

Omega completes 8 well P&A campaign on Norwegian Continental Shelf

Omega Case History Key Information • Run and set Omega’s V-Zero Retrievable Bridge Plug as a deep-set barrier. • Plug off reservoir. • Run entire operation as a DIY operation to reduce cost and POB constraints on the small rig. Objectives • Client: Repsol. • Location: Norway. • Field: Varg. • Well: Multiple. • Well Type: Producers and Injectors. • Tubing Details: 5-1/2” 20 & 23 lb/ft tubing. Results Omega completes 8 well P&A campaign on Norwegian Continental Shelf. Rev 002 28/07/2016 • All plugs successfully deployed to planned setting depth. • All HST setting tools successfully activated and set plugs as planned prior retrieval of HST. • All plugs successfully tested. • No incidents, accidents or non-conformances through the entire campaign. • 3,60” Omega HST Setting Too

Join for free to read