Case Study

OH Squeeze for Significant Loses

OH Squeeze for Significant Loses

WELL INTERVENTION DRILLING & COMPLETIONS UNCONVENTIONAL RESOURCES RESERVOIR OPTIMIZATION OH Squeeze for Significant Loses 425 x 788 TIP & Cement Retainer Kit Location: Gulf of Mexico CHALLENGE: An Offshore Operator endured significant losses while drilling their 12 1/4-in. open hole section. They were in a salt zone with TD at 11,519 ft. The 11 7/8- in. casing shoe was at 4,700 ft. and they determined that the losses were located around 6,000 – 7,000 ft. They wanted an open hole squeeze packer to squeeze cement into the losses. The customer already attempted pumping several slugs to remediate the problem without success. SOLUTION: TAM provided and ran the 4.25-in. x 7 .88-in. TAM Inflatable Packer (TIP) Cement Retainer with SE1 element to 10,200 ft. MD to squeeze cement and stop sign

Join for free to read