Case Study
Innovative Scale Squeeze Completed From FPSO
W orld’s largest squeeze completed on subsea well from FPSO, removing the need for a L WIV . CHALLENGE Scale build up in a wellbore and the associated production tubing was affecting production on a subsea well. As such, a treatment had to be designed to remove the scale build up as efficiently and economically as possible to allow the well to be r eturned to its maximum potential pr oduction rate. W orking with the oper ator , the Altus Int