Case Study

Oakland Air Control, Helping Worcester Cathedral’s Organ Stay In Tune!

Oakland Air Control, Helping Worcester Cathedral’s Organ Stay In Tune!

CASE STUDY www.oaklandgroup.com PROJECT DETAILS A previous installation (by others) was so badly designed and implemented that the solution had failed, so oakland were called in the first instance to produce a report as to what had gone wrong, and what could be done to rectify the situation. The Club has recently undergone a £10m redevelopment which included upgrades to its functions and hospitality facilities. The result of this was The View, a multi purpose function suite. To ensure comfort 365 days a year, the decision was taken to install a new HVAC system that met the wide ranging thermal requirements in a way that also enabled the multi purpose use of the space. Oakland Air Control, was contracted to install, test and commission a series of Daikin SkyAir Seasonal Classic

Join for free to read