Case Study
New Wind Turbine, Wairds Of Alpity, Arbuthnott, Aberdeenshire
NEW WIND TURBINE, WAIRDS OF ALPITY, ARBUTHNOTT, ABERDEENSHIRE Construction of a single wind turbine in a rural location. Works included the widening of the existing access roads as well as the construction of new access roads and a turning area, construction of a lay-down and crane base for the delivery and erection of the turbine. Excavation and construction of the heavy duty RC turbine base and foundations, ducting works, installat