Case Study

New Wind Turbine, Midtown Of Glass, Drummuir, Huntly, Aberdeenshire

New Wind Turbine, Midtown Of Glass, Drummuir, Huntly, Aberdeenshire

Pages 1 Pages

NEW WIND TURBINE, MIDTOWN OF GLASS, DRUMMUIR, HUNTLY, ABERDEENSHIRE Construction of a single wind turbine in a rural location. Works included the widening of the existing access roads as well as the construction of new access roads and a turning area, construction of a lay-down and crane base for the delivery and erection of the turbine. Excavation and construction of the heavy duty RC turbine base and foundations, ducting works, ins

Join for free to read