Case Study

New Fan On Existing Foundation

New Fan On Existing Foundation

Pages 2 Pages

Case study New fan on existing foundation New boiler and FGD processes called for a total change of the ID booster fan. The challenge In 2008 the power plant of Plzen, Czech Republic, owned by Plzenska energetika a.s., planned to do a boiler refurbishment. At the same time the FGD from the mid-nineties had to be upgraded in order to comply with today’s demands for bringing down emissions. The changes in the power plant processes caused

Join for free to read