New Facility Design: Power Equipment Manufacturer

New Facility Design: Power Equipment Manufacturer

Pages 1 Pages

CASE STUDY: NEW FACILITY DESIGN POWER EQUIPMENT MANUFACTURER The Challenge This manufacturer and distributor of power equipment tools was moving its distribution facilities. PeakLogix designed its new warehouse to ensure ongoing efficiency and productivity. The Results The new facility accommodates over 9,000 SKU’s in parts picking areas, of which over 7,000 are stored in carousels. The small parts pick rate has increased by nearly 4.5x, growing from 50 lines per hour to 220 line per hour by moving from Pick-to-Cart to Goods-to-Man. The Solution PeakLogix implemented a Goods-to-Man parts picking and processing system featuring two pods of (4) horizontal carousels in combination with pick-to-light carton flow to maximize small part pick efficiency. This system allows the operation to