Case Study
Increase Efficiency: Healthcare Products Manufacturer
CASE STUDY: INCREASE EFFICIENCY Healthcare Products Manufacturer The Challenge A healthcare products manufacturer needed to incorporate 4 additional product lines into their operations to meet product demands and business growth. The Solution PeakLogix designed an expanded conveyance system and sortation system. The integration included 450 feet of TGW’s IntelliROL 24V Motor-Driven Roller (MDR) conveyor, 4 Ambaflex spiral conveyors, 4 Mettler Toledo in-motion scales, and 5 additional sorter diverts along with controls for all new equipment. 800.849.6332 peaklogix.com Key Results The new production lines were seamlessly integrated into the existing sortation system, enabling product processing through robotic palletizing rather than manual palletization, and increasing sorter through