Case Study

New centralizer designed, tested and brought to market in 8 weeks

New centralizer designed, tested and brought to market in 8 weeks

Pages 1 Pages

Centek Centralizer | New centralizer designed, tested and brought to market in 8 weeks THE CHALLENGE To ensure a good cement job in a well with a depth of 1,545mMD, inclination 30 degree and hole size at TD of 12.25” and to maximize core recovery in the chalk reservoir where the reservoir was cored in 12.25”. The production casing run in the section was 7”. Good centralization and cementation of the 7” production casing in the 12.25” hole was essential to avoid migration of hydrocarbons and problems with the frac treatment in a later stage. After a review of the market, it was found that no centralizers for 7” casing in a 12.25” hole, with the desired properties, were available. THE SOLUTION Centek designed and tested a 7" x 12.25” centralizer within 8 weeks. THE RESULT The delivery of th