Case Study
New Build School Facility
EHW were appointed to provide architectural and design coordination services to Ashe Construction during the build phase on site. The project comprised the erection of a two story teaching facility to provide four dedicated classrooms at both ground and fi rst fl oor levels for this two-form entry primary school offering placements for children aged between 4 and 11. In addition to the new teaching space, further smaller learning resource rooms, small group spaces and ancillary toilets for pupils and staff were created. The new building was a detached block with its own heating plant and was constructed using a steel structural frame, a cavity wall external envelope with a mix of facing brickwork and render to the façade, and a fl at roof with a single ply membrane. Client Ashe