Case Study
NEW ASSEMBLY HALL
CLIENT King John School ARCHITECT Munday and Cramer VALUE £1.1m PERIOD 35 weeks Evers: Building since 1918. www.tjevers.co.uk 01621 815787 info@tjevers.co.uk TJ Evers Ltd, New Road, Tiptree, Colchester, Essex CO5 NEW ASSEMBLY HALL KING JOHNS SCHOOL, BENFLEET The scheme was to construct a new assembly hall with a stage, store rooms and a dedicated AV (Audio Visual) room with seating for up to 400 people. The building is of a pentagon shape consisting of strip foundations and a leaning steel frame structure.The floor is of a block and beam construction with an insulated screed on top. The inner leaf of the building is blockwork with a studwork partition on the inside. The bottom part of the external leaf is brickwork as well as the