Case Study
New 2.0 MG Tank Provides Updated Infrastructure
A TANK WE ARE PROUD OF INSIDE AND OUT DN TANKS Chris Hodgson, New England Regional Manager 11 Teal Road Wakefield, MA 01880 Phone: 781.246.1133 New 2.0 MG Tank Provides Updated Infrastructure New Haven Area, Connecticut The South Central Connecticut Regional Water Authority awarded a contract for re-painting and rehabilitation of a 4.3 million gallon steel water storage tank. The project was carefully planned, to undertake ta