The Power To D ream www.urbangreenenergy.com/solutions/green-energy-for-business Project At A Glance COMPLETED November 2010 LOCATION Rickenbacker Air Base, Ohio (USA) CUSTOMER National Guard SOLUTION Four turbines installed in unison feed energy back into the grid through a single set of electronics, offsetting local base energy consumption COMPONENTS Four roof-mounted eddyGT wind turbines take advantage of strong prevailing winds Project Highlights In November 2010, 4 eddyGT vertical axis wind turbines were installed at the Rickenbacker Air n ational Guard Base at the 121st Air Refueling Wing (ARW). The wind turbines were installed to partially power the base through wind energy, helping Rickenbacker meet its green energy goals. The 4 eddyGTs generate up to 4000 watts of ene