Case Study
Na¨ssjo¨, 12 MW Hot Water, 2008
2008, Nässj Näs Bioe The facil provide and mee use of th The faci condens biofuels ö 12 MW, eng a. 11, Fre ssjö, energy ity at Nässjö the summer et the additio he existing fa ility is equipp ser to handle is 35-50% m docx eemantle Busi T 12 M y Plan ö Affärsverk w r heating req onal winter l acility. ped with a fl e peak fuel lo moisture cont iness Centre, Tel: 023 8063 MW H nt was installed uirements oad with the