Case Study

Na¨ssjo¨, 12 MW Hot Water, 2008

Na¨ssjo¨, 12 MW Hot Water, 2008

                    2008, Nässj Näs Bioe   The facil provide  and mee use of th  The faci condens biofuels  ö 12 MW, eng a. 11, Fre ssjö,  energy ity at Nässjö the summer et the additio he existing fa ility is equipp ser to handle is 35-50% m docx  eemantle Busi T 12 M y Plan ö Affärsverk w r heating req onal winter l acility.  ped with a fl e peak fuel lo moisture cont iness Centre, Tel: 023 8063 MW H nt   was installed uirements  oad with the

Join for free to read