Case Study
SWEDWOOD, Poland: 3MW Thermal Oil, 2MW Steam, 2009
2009, Swed SW 3MW Bioe The bioe installed waste fr The furn boards, s and extr The furn grate an Fuel moi Power: Custome Location Activity: Year bui dwood, polen 3,2 11, Fre EDWO W Th energy energy plant d to take adv om board pr nace fuel con sawdust, du racted dust. nace consists d dust burne isture is app 3MW th er: Swedwo n: Poland : Product ilt: 2009 MW, eng a.docx eemantle Busi T OOD, herma y Plan at Swedwoo a