Case Study

SWEDWOOD, Poland: 3MW Thermal Oil, 2MW Steam, 2009

SWEDWOOD, Poland: 3MW Thermal Oil, 2MW Steam, 2009

            2009, Swed SW 3MW Bioe   The bioe installed waste fr The furn boards, s and extr The furn grate an Fuel moi   Power:   Custome Location Activity: Year bui dwood, polen 3,2  11, Fre EDWO W Th energy energy plant  d to take adv om board pr nace fuel con sawdust, du racted dust.  nace consists d dust burne isture is app 3MW th er:   Swedwo n:   Poland  :   Product ilt:   2009  MW, eng a.docx eemantle Busi T OOD, herma y Plan at Swedwoo a

Join for free to read