MOVE OF A RIM ROM UNIT Recticel commissioned Convoi GmbH to move part of a RIM ROM Unit from Unterriexingen (Germany) to Ningbo in Shanghai (China). The other section of the unit was to be moved internally. The assignment entailed disconnecting the electrics, hydraulics and mechanical parts of the section of the plant (25%) that was bound for Shanghai before packaging and shipping the lot to its ?nal destination. No sooner had we begun reassembling the equipment than Convoi was asked to also move the remaining 75% of the plant internally within Unterriexingen. The 25% shortfall was to be made up of parts from a di?erent production location so that the Unterriexingen plant would end up with a fully operational production line. Working at 2 separate locations meant that the ‘Recticel team’ h