Case Study

Mountain Wind Interconnection

Mountain Wind Interconnection

Pages 2 Pages

Mountain Wind Interconnection Client: Edison Mission Energy Location: Evanston, Wyoming, USA POWER provided straight EPC (engineering, procurement, construction) services on these fast-track interconnection projects near Evanston, WY . Diverse aspects of the work The project scope of work included a 138 kV three-breaker ring bus switchyard with an ultimate six-breaker configuration designed for the first of several planned interconnection phases along with a control building and microwave communication system; the construction of a three-mile loop-in 138 kV wood pole transmission line feeding to the new Muddy Creek Switchyard; the installation of approximately 5.1 miles of OPGW; re-conductoring approximately 1.6 miles of another 138 kV transmission line and reconstruction of a nine-